15.7.08

Tuesday, March 20 (1945)

Wattaday. Started out to get going on new 4". Instead of four inch location being success, C.W. gave me hell for letting Bedow put up so much scaffolding. All kinds of troubles going on. Finally found that condenser seemed to have too much and too cold water in bottom. Looked like a leak. Tested it. Showed pH of 7.6 looked rather bad. then broke connections and found on hydraulic test that we did have a leak. Not a very large one however. Hooked up and came home.