15.7.08
Wednesday, March 21 (1945)
Another strenuous day. 6"main steam lines to racks Nos 1 and two developed leaks. Luckily above the valve. Worked a whole with Main relative to condensate tank. Found pressure of 11# with no blast through seal!!! In PM tried to get Beddoe lined up on new pressure freeze off system. So busy with miscellaneous nick nacks of jobs, never got anything much done. Weather has turned cold and raw.
Tuesday, March 20 (1945)
Wattaday. Started out to get going on new 4". Instead of four inch location being success, C.W. gave me hell for letting Bedow put up so much scaffolding. All kinds of troubles going on. Finally found that condenser seemed to have too much and too cold water in bottom. Looked like a leak. Tested it. Showed pH of 7.6 looked rather bad. then broke connections and found on hydraulic test that we did have a leak. Not a very large one however. Hooked up and came home.
Wednesday, March 7 (1945)
Chiefly another wonderful day. Talked with Carbide people relative to water treatment and got very courteous service. Bedoe came in pretty badly flustered because he had order to start work on automatic "dog house" operation. Did a lot of checking only to find that no two were alike. Finally got hold of Wentgate and talked over a little simplification.
Subscribe to:
Posts (Atom)